What can we help you with?

Similar Articles

Learn The Basics

Troubleshooting

How Do I Change the Order of Lessons and Assessments in a Course?


Once a course has been added to the system and contains more than one lesson, you can change the order in which the lessons must be completed.


  1. On the left column, go to Courses.
  2. Click on the relevant course name.
  3. Click on the course Certificates tab which is the second tab at the top of the page.
  4. Click the down arrow beside Rules/Order to expand that section.
  5. Click on the Lessons section.
  6. Drag and drop the lessons to the preferred order.
  7. If you want to lock the sequence in which the lessons have to be taken to create a linear learning experience, select the boxes on the right hand side beside each lesson. If this box is ticked, the lesson can only be taken once the previous lesson has been completed.
  8. Click Save Changes.

Recently Viewed

Visit other post to show recently viewed